Difference between revisions of "Operations:Operations"

From PHR CRM
(Created page with "INVENTORY AND EQUIPMENT Asphalt - 20 TR's [3 ply boards] 4 - full spare propane tanks 1- Lute  3 - shafted rakes 3 - asphalt scrapers 1 - square shovel 2 - D handle shovels...")
 
Line 2: Line 2:
  
 
Asphalt - 20 TR's [3 ply boards]
 
Asphalt - 20 TR's [3 ply boards]
 +
 
4 - full spare propane tanks
 
4 - full spare propane tanks
 +
 
1- Lute 
 
1- Lute 
 +
 
3 - shafted rakes
 
3 - shafted rakes
 +
 
3 - asphalt scrapers
 
3 - asphalt scrapers
 +
 
1 - square shovel
 
1 - square shovel
 +
 
2 - D handle shovels
 
2 - D handle shovels
 +
 
3 - brooms
 
3 - brooms
 +
 
1 - sledge hammer
 
1 - sledge hammer
 +
 
1 - 3lb hammer
 
1 - 3lb hammer
 +
 
1 - hand tamper
 
1 - hand tamper
 +
 
1 - cresent wrench
 
1 - cresent wrench
 +
 
1 - channel lock
 
1 - channel lock
 +
 
1 - socket wrench set
 
1 - socket wrench set
 +
 
1 - digging bar
 
1 - digging bar
 +
 
1 - pipe wrench
 
1 - pipe wrench
 +
 
1 - paint scraper
 
1 - paint scraper
 +
 
1 - water pump
 
1 - water pump
 +
 
3 - spray bottles
 
3 - spray bottles
 +
 
1 - spray paint 
 
1 - spray paint 
 +
 
Sidewalk chalk
 
Sidewalk chalk
 +
 
1 - laser thermometer 
 
1 - laser thermometer 
 +
 
5 - 5gallon buckets with crush [put holes in bottom]
 
5 - 5gallon buckets with crush [put holes in bottom]
 +
 
1 - 5gallon metal bucket
 
1 - 5gallon metal bucket
 +
 
1 - 5gallon bucket
 
1 - 5gallon bucket
 +
 
2 - tar buckets
 
2 - tar buckets
 +
 
2 - torch heads
 
2 - torch heads
 +
 
2 - propane refill
 
2 - propane refill
 +
 
1 - fire extinguisher 
 
1 - fire extinguisher 
 +
 
3 - roadside triangles
 
3 - roadside triangles
 +
 
1 - tire gauge
 
1 - tire gauge
 +
 
1 - jumper cables
 
1 - jumper cables
 +
 
1 - IR machine
 
1 - IR machine
 +
 
1 - roller
 
1 - roller
 +
 
1 - 3tonne jack
 
1 - 3tonne jack
 +
 
Spare risers (all available sizes)
 
Spare risers (all available sizes)
 +
 
1 - spare IR & Cooker blankets
 
1 - spare IR & Cooker blankets
 +
 
2 - water containers 
 
2 - water containers 
 +
 
1 - diesel container
 
1 - diesel container
 +
 
1 - gas container
 
1 - gas container
 +
 
Safety cones
 
Safety cones
 +
 
2 - spare sparkplug
 
2 - spare sparkplug
 +
 
Tie down straps 
 
Tie down straps 

Revision as of 17:47, 30 December 2022

INVENTORY AND EQUIPMENT

Asphalt - 20 TR's [3 ply boards]

4 - full spare propane tanks

1- Lute 

3 - shafted rakes

3 - asphalt scrapers

1 - square shovel

2 - D handle shovels

3 - brooms

1 - sledge hammer

1 - 3lb hammer

1 - hand tamper

1 - cresent wrench

1 - channel lock

1 - socket wrench set

1 - digging bar

1 - pipe wrench

1 - paint scraper

1 - water pump

3 - spray bottles

1 - spray paint 

Sidewalk chalk

1 - laser thermometer 

5 - 5gallon buckets with crush [put holes in bottom]

1 - 5gallon metal bucket

1 - 5gallon bucket

2 - tar buckets

2 - torch heads

2 - propane refill

1 - fire extinguisher 

3 - roadside triangles

1 - tire gauge

1 - jumper cables

1 - IR machine

1 - roller

1 - 3tonne jack

Spare risers (all available sizes)

1 - spare IR & Cooker blankets

2 - water containers 

1 - diesel container

1 - gas container

Safety cones

2 - spare sparkplug

Tie down straps